Timbersleds™ installed on Nederland dock
Six Timbersleds™ installed on Dock 7
Deepwater was contracted by Energy Transfer to manufacture and install an impressed current cathodic protection (ICCP) system for its Dock 7 in Nederland, Tx. Deepwater installed six timber anode sleds and terminated their anode header cables inside two anode junction boxes.