Way Ahead In Corrosion Control

28 Year Study of I-Rod performance in the field

June 24, 2017

Download this paper

The following images were captured in 2017 during a routine topside inspection of the first offshore structure where I-Rod® pipe supports were specified (see the 13-year study for photos of the same support material in 2002). The system was installed in 1989 for less than $10,000 USD. These photos show the long-term success of the system at 13 and 28 years when Deepwater Corrosion Services, Inc. visited the structures for inspections in 2002 and 2017.

Related Links