Way Ahead In Corrosion Control

RetroLink anode strings installed

Apache’s EC-2-C retrofit in the Gulf of Mexico

PRB3004_wide2.webp

Six anode strings provide CP for Apache’s EC-2-C structure

Deepwater installed six RetroLink™ anode strings on Apache’s EC-2-C 4-pile structure in the Gulf of Mexico. The platform sits in less than 30 feet of water and required 42-foot RetroLinks™ to be suspended from horizontal standoffs welded to tubular members above the water line. Total time for job completion – including travel – was six hours.

Download case study