Search results
Your search for 天弘中证银行ETF联接C负1点8 returned 371 results.
-
Office locations
Global Locations (function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start': new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src=…
/about/global-locations/
-
Thank you
Thank you (function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start': new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src= 'https://www.googletagmanager.com/gtm.js?id='+i+dl;f.parentNode.insertBefore(j,f);…
/about/thank-you/
-
New CP anodes for a 720' platform in less than 2 days
New CP anodes for a 720' platform in less than 2 days (function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start': new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src=…
/news/new-cp-anodes-for-a-720-platform-in-less-than-2-days/
-
Project: Houston Ship Channel Dock anode retrofit
In 2017-18, Deepwater retrofitted the cathodic protection system on 5 docks at the Houston Ship Channel Terminal
/about/experience-overview/project-review-bulletin-3669/
-
Deepwater turns 30
Deepwater turns 30 (function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start': new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src=…
/news/deepwater-turns-30/
-
Project: RetroPod system used in the Ras Gharib Field
New anodes retrofitted for a fixed platform in the Egyptian Red Sea boost the cathodic protection system for 20 more years.
/about/experience-overview/project-review-bulletin-12/
-
Project: Self monitored anode sled for the Olympus field
RetroPod XL anode sled with permanent monitoring used in the Gulf of Mexico to provide cathodic protection for 24 PGBS at 3000 ft for 45 years.
/about/experience-overview/project-review-bulletin-3145/
-
Nederland dock supplemental CP system
Deepwater was engaged to build and install (6) Anode Timber Sleds for Ship Docks 3 and 5 at the Energy Transfer (ET) Nederland Terminal, based on field testing performed by the client which revealed that the structure's cathodic protection was not fully protecting the dock.
/about/experience-overview/project-review-bulletin-30103/
-
Tower CP modeling
Deepwater constructed a predictive model of a tower located in 1,700 feet of seawater to estimate the remaining life of its corrosion prevention system.
/about/experience-overview/project-review-bulletin-30125/
-
Recap Subsea Datalogger
The Recap is designed to record cathodic protection potentials and other data on drilling riser systems and subsea equipment.
/products-and-services/recap-data-logger/