Search results
Your search for 德联集团2025-05-06至2025-05-21异动分析 returned 370 results.
-
Project: 24 Inch Methanol Pipeline Anode Retrofit
Concrete mattresses with integral anodes (Retromat) used to retrofit new cathodic protection for a pipeline in Equatorial Guinea.
/about/experience-overview/project-review-bulletin-17/
-
Project review: mini-gateway retrofit on Chinook Field PLET
Deepwater installed a mini-gateway retrofit anode system in the Cascade / Chinook field on a PLET.
/about/experience-overview/project-review-bulletin-18/
-
Project review: anode strings retrofit on EI 295-A
Deepwater installs RetroLinks on a 220 ft platform in the Gulf of Mexico to restore adequate levels of cathodic protection.
/about/experience-overview/project-review-bulletin-3135/
-
LAF-1 and LAF-2 fitted with Retrobuoy system
Deepwater installs three impressed current cathodic protection retrofit anode sleds on 2 platforms in the Gulf of Guinea, extending the life by 20 years.
/about/experience-overview/project-review-bulletin-3314/
-
Project: Erawan platforms get new anodes
Deepwater installs RetroPods and V-Strings in the Gulf of Thailand to extend the life of two bridge-connected jackets in 200 ft of water.
/about/experience-overview/project-review-bulletin-3080/
-
Ewing Bank 305-A gets new life with Retrobuoy anode sleds
Deepwater added 20 years of anode life to EW-305 with two RetroBuoy impressed current cathodic protection (ICCP) sleds.
/about/experience-overview/project-review-bulletin-3137/
-
Project Review: Hanging anode system for FSO
Deepwater installs the RetroSAM anode system to protect the hull of the offshore storage installation (OSI) at Liverpool Bay
/about/experience-overview/project-review-bulletin-7066/
-
Project: Third Party Verification of CP on Tamar Field
Cathodic protection design review on the individual and combined components of the Tamar field in the eastern Mediterranean.
/about/experience-overview/project-review-bulletin-26/
-
4.5 km pipeline anode retrofit Gulf of Mexico (Project)
In 2014, Chevron needed cathodic protection (CP) retrofit anodes for their 8” wet oil pipeline running from their fixed jacked platform BM 1 T/HH to shore.
/about/experience-overview/project-review-bulletin-3361/
-
Pipeline Excavation Tool (PET™) installs RetroClamp™
Excavation of shallow buried underwater pipeline near Grand Isle, LA
/about/experience-overview/project-review-bulletin-3827/