Search results
Your search for 2025年12月9日通信ETF尾盘操作建议 returned 104 results.
-
I-Rod® 28 years after installation
The system was installed in 1989 for less than $10,000 USD. These photos show the long-term success of the system at 13 and 28 years when Deepwater Corrosion Services, Inc. visited the structures for inspections in 2002 and 2017.
/news-items/i-rod-28-year/
-
Corrosion Engineer
Deepwater Corrosion Services is always looking for talented and energetic people to join our staff. Please see the list of jobs currently available.
/careers/sr-corrosion-cathodic-protection-consultant/
-
Polatrak® ROV-II CP probe
Tip-contact probe and/or proximity probe for ROVs and divers, for cathodic protection survey with dual reference electrodes.
/products-and-services/rov-ii/
-
Timber Sled™
Low-profile ICCP sled for docks and jetties in fresh or brackish water
/products-and-services/timbersled/
-
RetroLinks™ installed on small structure
Deepwater installed 14 RetroLinks™ on a small Gulf of Mexico structure.
/about/experience-overview/project-review-bulletin-3868/
-
Deepwater retrofits cathodic protection on two deep water subsea field developments in three days
Deepwater retrofits cathodic protection on two deep water subsea field developments in three days (function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start': new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0],…
/news-items/pr8/
-
Project: Arnold / Oyster field anode retrofit
New cathodic protection anodes installed on two deep water fields in just 73 hours, including well trees, flowline manifolds, umbilical termination units, and flow lines.
/about/experience-overview/project-review-bulletin-04/
-
CP simulation on an offshore platform
Data from an example platform’s CP surveys was matched to the depolarization curve to provide a timeline. The purpose of the study is to determine whether a CP retrofit is required to meet end of life goals and if so, when the red line occurs for doing so economically to maximize the benefit of the …
/about/experience-overview/project-review-bulletin-71941/
-
28-year study of I-Rod® performance in the field
28-year study of I-Rod® performance in the field (function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start': new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src=…
/news/28-year-study-of-i-rod-performance-in-the-field/
-
13-year study of I-Rod® performance in the field
13-year study of I-Rod® performance in the field (function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start': new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0], j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src=…
/news/13-year-study-of-i-rod-performance-in-the-field/