Search results
Your search for 2025年8月20日 解放者杯1/8决赛 比赛预测 比分预测 returned 383 results.
-
4.5 km pipeline anode retrofit Gulf of Mexico (Project)
In 2014, Chevron needed cathodic protection (CP) retrofit anodes for their 8” wet oil pipeline running from their fixed jacked platform BM 1 T/HH to shore.
/about/experience-overview/project-review-bulletin-3361/
-
Project: PanYu 30-1 Platform cathodic protection anode retrofit
RetroBuoy impressed current anode sleds installed to retrofit cathodic protection on an 8 leg fixed platform in the South China Sea.
/about/experience-overview/project-review-bulletin-33/
-
Monitoring system installed on Australian pipeline
Deepwater was contracted in 2018 to supply a SunStation™ system for monitoring the potential of a pipeline using a V-String™ reference electrode and to monitor the output current of an MA-1™ monitored anode on the Spool Connection Assembly (SCA).
/about/experience-overview/project-review-bulletin-9018/
-
Deepwater Corrosion Services Inc.
Way ahead in corrosion control: cathodic protection engineering, anode systems, monitoring and inspection services.
/
-
MA-1 monitored sacrificial anode
A sacrificial aluminum or zinc anode fitted with a Polatrak monitor that allows the operator to measure anode depletion rates and cathodic protection levels on platforms and pipelines.
/products-and-services/monitored-anode/
-
Topside level 1 inspection services
Since 1986, Deepwater has been providing offshore level 1 risk-based corrosion and structural inspection offshore.
/products-and-services/level-1-inspection/
-
CP Retrofit: BARD 1 OWF OSS platform
Remote impressed current cathodic protection system retrofit to replace spent anodes on a North Sea German offshore wind farm OSS.
/about/experience-overview/project-review-bulletin-7049/
-
LAF-1 and LAF-2 fitted with Retrobuoy system
Deepwater installs three impressed current cathodic protection retrofit anode sleds on 2 platforms in the Gulf of Guinea, extending the life by 20 years.
/about/experience-overview/project-review-bulletin-3314/
-
CP monitoring installed on marine fueling dock
Deepwater Do Brasil Engenharia Ltda installed a CP monitoring system on the Açu Maritime Fuel Terminal - TECMA on December 27, 2020. The dock is used for marine fueling and has two berths: Berth 1, which measures 185m X 32m, and Berth 2, which measures 110m X 21m.
/about/experience-overview/project-review-bulletin-6007/
-
Port of Alaska dock CP retrofit
Deepwater installed 8 Raparound™ pile-mounted anodes on a Cook Inlet dock at the Port of Alaska.
/about/experience-overview/project-review-bulletin-3892/