Texas ICCP dock retrofit

Docks retrofit in Nederland, Texas

Prb 30103 Top Photo WEB

Deepwater was engaged to build and install (6) Anode Timber Sleds ​for Ship Docks 3 and 5 at the Energy Transfer (ET) Nederland Terminal, based on field testing performed by the client which revealed that the structure's cathodic protection was not fully protecting the dock.

Each sled was manufactured with (6) 3.2” x 84” Tubular Anodes at Deepwater's Houston facility.  Deepwater also specified the power cable and replacement rectifiers (2) to power the system, based on design criteria provided by the clients in house cathodic protection engineers.

After the equipment was inspected at the factory, it was shipped to the site. Installation took a single day; approximately 2 hours per sled.